Precautions 1. Half an hour before the opening, open all the equipment and conduct low temperature preheating, and detect all equipment and lines at the same time. The low temperature state refers to the light light;

Precautions

1.Half an hour before the opening, open all the equipment and conductlow temperature preheating, and detect all equipment and lines at thesame time. The low temperature state refers to the light light;


2.After fifteen minutes, the equipment is zero to allow the equipmentto dissipate heat. The heat dissipation time is not less than fifteenminutes;


3.After heat dissipation, you can formally enter the music performancestage;


4.After the performance is over, after the guest leaves, the lightingmaster should turn off all the equipment and let the equipment heatdissipation for 15 to 20 minutes, and then seal or cover theequipment to leave the field.


Themaintenance and maintenance of the lighting equipment is morecomplicated and trivial. It is basically a daily routine test,regular testing, monthly equipment maintenance and appropriatedebugging;

Thescope of conventional detection includes:


1.Whether the light bulb can light up normally;


2. Whether the connection of all equipment isnormal;


3.Whether all equipment can be used normally, including the lightcontrol switch, color replacement control, computer light movement,etc.


4.Whether the DMX512 signal can control the lamps normally;


5.Whether the special effect equipment is used normally and is filledwith the required materials, such as: hood, fog machine, snowflakemachine, bubbler, etc.


Regulartest every week

Payattention to the following points in addition to all projects per dayof daily monitoring every week.


1.Mainly detect the connection of the device during weekly inspection,including the power connection, DMX512 connection, etc. to see ifthere are loose, whether there is a breakpoint, etc.


2.When conducting weekly testing at the same time, the light positionand DMX512 programming should be adjusted more comprehensively;


Monthlyequipment maintenance and appropriate adjustment


Theappropriate adjustment of each month, except for daily monitoring andall the work of weekly inspection, this will be a very detailed job,which requires multiple departments to coordinate, such as actors,bands, weak electricity, security, cleaning, etc. When testing,complete the following tasks.


1.Light position adjustment; because some lamp positions or changes inthe guest area will occur during use, which leads to changes in thelamp position, it must be adjusted every month. ;


2.The detection of mechanical equipment, including computer lightmotors, color changing motors, nozzles of special effects equipment,etc.


3.Check all lines. To detect whether there are breakpoints, damage, andleakage, because in the use, it is inevitable that some human factorsare various accidents in the line, such as the threaded wires arestepped on, frequently inserted wires or breakpoints, and there arebreakpoints. Occasionally, because of the launch of the drinking lineand even short circuit, etc., this test should be very careful. Thisdetection requires weak electricity to cooperate with;


4.Clean the dust and garbage inside and outside the lamp. In the use,there will be some garbage in itself, such as the garbage that thebulb explosion remains in the lamp body. In addition, the computerlamps and special effect machinery in the audience area for a longtime are easy to fall into some garbage, such as color strips, glasspupa, alcoholic drinks, drinks and drinks The residual liquid and soon. Therefore, wipe the garbage and dirt on the outside of the lampand remove the garbage inside the lamp. This link needs to be cleanedup;


5.Check all fire prevention equipment. Lighting and audio are the mostconcentrated types of work in circuits, strong electricity in weakpower, many related equipment, and more related wires, so fireprevention is the top priority in the lighting work. Cooperate withthe Ministry of Security to comprehensively test all fire preventionfacilities and fire extinguishing equipment. The scope of monitoringincludes the normal degree of fire prevention equipment, whether thechoice of fire extinguishing equipment is normal, whether it isduring the shelf life, etc.;


Inaddition, in addition to the above -mentioned daily monitoring,weekly inspection, and full monthly inspection, the lighting mastermust know all the situations of the equipment and the environment, soas to do everything in time to deal with it in order to get a goodvisual environment. Security.